How a garden room is built, step by step
From the first call to handing over the keys. We confirm timings for yours at the survey.
- Survey
- Within a week or two
- Base
- A day to a week
- Build and finish
- 2 to 5 weeks
- Total on site
- 3–6 weeks
Enquiry
You tell us what the room is for, roughly how big, and when you’d like it.
Day 1
Survey
We visit to measure up, check access, ground conditions, trees and the cable run from the house, and talk through your ideas.
Within a week or two
Design and written quote
You get a layout and an itemised quote covering the base, structure, insulation, glazing, electrics and finish.
Planning check
Most rooms are permitted development and need nothing. If yours needs permission, or you want a Lawful Development Certificate, it’s sorted before building starts. Annexes almost always need permission.
If needed, around 8 weeks
Base and groundworks
Ground screws usually go in within a day. A concrete slab takes longer, because it has to be dug, poured and left to cure. The trench for power and data is dug now too.
A day to around a week
Frame, roof and walls
The floor, frame and roof go up, followed by insulation, the roof covering, cladding and glazing. From here, the room is watertight.
Around 1 to 3 weeks
Electrics and finishing
Sockets, lighting and heating are fitted and certified by a registered electrician. Inside walls, ceiling and flooring are finished.
Around 1 to 2 weeks
Handover
A final check together, the site left clean, and your paperwork: the electrical certificate, guarantees and any planning documents.
Typically 3 to 6 weeks on site in total
Timings are typical. Weather, the ground and how busy the season is all play a part, and spring books up fastest.
Get a free garden room quote
Tell us what you have in mind and we’ll be in touch to arrange a free survey and quote.
Covering Harlow, Bishop's Stortford, Sawbridgeworth, Epping, Hertford, Ware and Ongar, and the villages in between.